Jaeger is a popular open-source tool used for distributed tracing in a microservice architecture. In a microservice architecture, a user request or transaction can travel across hundreds of services before serving what a user wants. Distributed tracing helps to track the performance of a transaction across multiple services.

Cover Image

Jaeger is a fantastic open-source tool for distributed tracing. But for effective resolution of production issues, engineering teams need both metrics and traces. SigNoz, a full-stack open-source tool, provides a unified UI for both metrics and traces.

Before we deep dive into how Jaeger accomplishes distributed tracing for microservices-based architecture, let's take a short detour to understand distributed tracing.

What is distributed tracing?

In the world of microservices, a user request travels through hundreds of services before serving a user what they need. To make a business scalable, engineering teams are responsible for particular services with no insight into how the system performs as a whole. And that's where distributed tracing comes into the picture.

Microservices architecture
Microservice architecture of a fictional e-commerce application

Distributed tracing gives you insight into how a particular service is performing as part of the whole in a distributed software system. There are two essential concepts involved in distributed tracing: Spans and trace context.

Read our complete guide on Distributed Tracing

User requests are broken down into spans.

What are spans?
Spans represent a single operation within a trace. Thus, it represents work done by a single service which can be broken down further depending on the use case.

A trace context is passed along when requests travel between services, which tracks a user request across services. Thus, you can see how a user request performs across services and identify what exactly needs your attention without manually shifting through multiple dashboards.

Trace context is passed to track user requests across services
A trace context is passed when user requests pass from one service to another

What is Jaeger?

Jaeger is a distributed tracing tool meant to monitor and troubleshoot transactions in a microservice architecture. It was developed by teams at Uber and then open-sourced in 2015. It was accepted as a Cloud Native Computing Foundation (CNCF) Incubation project in 2017 and was promoted to graduate status in 2019.

With Jaeger you can generate and visualize trace data, which gives you an idea of how your requests are performing across services.

How does Jaeger track transactions across a microservice architecture?

There are four key components to a distributed tracing tool. These components together capture transactions into spans and then correlate those spans to form a trace.

The four key components are:

  • Instrumentation
  • Data pipeline
  • Backend Storage
  • Web UI/Visualization
Jaeger architecture
Jaeger architecture (Source: Jaeger Website)

Let us see in detail what these components are and how these components come together to monitor a microservice architecture.

Instrumentation

What is instrumentation?

Instrumentation is the process of generating telemetry data(logs, metrics, and traces) from your application code. It is essentially writing code that enables your application code to emit telemetry data, which can be used later to investigate issues.

Most distributed tracing tools offer clients libraries, agents, and SDKs to instrument application code. Jaeger's client libraries for instrumentation are based on OpenTracing APIs.

OpenTracing was an open-source project aimed at providing vendor-neutral APIs and instrumentation for distributed tracing. It later got merged into OpenTelemetry. Jaeger has official client libraries in the following languages:

  • Go
  • Java
  • Node.js
  • Python
  • C++
  • C#

When a service is instrumented, it generates spans for incoming transactions and attaches trace context to outgoing transactions.

Data pipeline

Once the trace data is collected with the help of client libraries, it can be directly sent to the storage backends for storage and visualization. But it's a good practice to have a tracing pipeline for data buffering as the application scales. The pipeline enables receiving data in multiple formats, manipulation, batching, indexing, and queueing.

Jaeger provides Jaeger collectors, as seen in the architecture diagram. The collectors validate traces, index them and perform any transformation before storing the trace data.

Backend Storage

Jaeger ships with simple in-memory storage for testing setups. Jaeger supports two popular open-source NoSQL databases as trace storage backends:

  • Cassandra
  • ElasticSearch

Web UI/Visualization

Jaeger's UI is basic but comprehensive when it comes to distributed tracing.

Jaeger UI showing services and corresponding traces
Jaeger UI showing services and corresponding traces

Jaeger UI showing spans
Jaeger's UI showing spans for selected traces

Challenges of using Jaeger

Jaeger is a preferred choice when it comes to distributed tracing. But engineering teams need more than traces to resolve issues quickly. They need access to both metrics and traces. Metrics such as response times, error rates, request rates, and CPU usage are equally important to understand application performance.

A few key challenges of using Jaeger as a distributed tracing tool are as follows:

  • Only provides trace data. You will have to use another tool for metrics and log management.
  • Databases supported by Jaeger need active maintenance.
  • Jaeger's web UI is limited with basic visualizations.

For a fast-moving engineering team, you need dashboards that can drive quick insights and resolution. And that's where SigNoz comes into the picture. It is a great alternative to Jaeger for distributed tracing in microservices.

SigNoz - a Jaeger alternative for microservices

SigNoz is a full-stack open-source application performance monitoring and observability tool which can be used in place of Jaeger. SigNoz is built to support OpenTelemetry natively. OpenTelemetry is becoming the world standard to generate and maintain telemetry data(Logs, metrics, and traces).

SigNoz can be used as a distributed tracing tool for a microservice architecture.

It also provides a fast OLAP datastore, ClickHouse as the storage backend.

Architecture of SigNoz with OpenTelemetry and ClickHouse
Architecture of SigNoz with ClickHouse as storage backend and OpenTelemetry for code instrumentatiion

SigNoz comes with out of box visualization of things like RED metrics.

SigNoz UI showing the popular RED metrics
SigNoz UI showing application overview metrics like RPS, 50th/90th/99th Percentile latencies, and Error Rate

You can also use flamegraphs to visualize spans from your trace data. All of this comes out of the box with SigNoz.

Flamegraphs used to visualize spans of distributed tracing in SigNoz UI
Flamegraphs showing exact duration taken by each spans - a concept of distributed tracing

Some of the things SigNoz can help you track:

  • Application overview metrics like RPS, 50th/90th/99th Percentile latencies, and Error Rate
  • Slowest endpoints in your application
  • See exact request trace to figure out issues in downstream services, slow DB queries, call to 3rd party services like payment gateways, etc
  • Filter traces by service name, operation, latency, error, tags/annotations.
  • Run aggregates on trace data
  • Unified UI for both metrics and traces

Getting Started with SigNoz

SigNoz can be installed on macOS or Linux computers in just three steps by using a simple install script.

The install script automatically installs Docker Engine on Linux. However, on macOS, you must manually install Docker Engine before running the install script.

git clone -b main https://github.com/SigNoz/signoz.git
cd signoz/deploy/
./install.sh

For detailed instructions, you can visit our documentation.

Deployment Docs

You can check out SigNoz's GitHub repo here 👇

SigNoz GitHub repo


Jaeger distributed tracing - complete guide